![](https://jbconstructionco.com/wp-content/uploads/2020/05/mc2-800x400.jpg)
![](https://jbconstructionco.com/wp-content/uploads/2020/05/ng3-800x400.jpg)
Project Description
Location: Plano, Texas
Year Completed: 2019
John Burns Construction Company of Texas completed a gas line extension and service for the Medical City of Plano Hospital in Plano Texas in the first quarter of 2019. This project enabled a new gas line to service an additional hospital wing for new patients.
The Challenges
- Over 800 LF of 2” HDPE gas line, which included segments that were installed by open cut, bore and sleeves.
- Multiple changes in the scope occurred as construction progressed in the line and grade of the proposed pipe.
- Parking and logistical challenges due to tight spaces, with working side by side with new building construction, required exceptional coordination.