mr

Project Description

Client: Tiseo Paving Company
Location: Flower Mound, Texas
Year Completed: 2019
Contract Value: $1,072,466

John Burns Construction Company of Texas was contracted for the installation of over 2,000 linear feet of 20” ductile iron waterline with various outlets, gate valves and cathodic protection. The project also included a storm drainage packages ranging in size from 18” to 48” reinforced concrete pipe and inlets.

The Challenges

  • This project included a waterline installation near an existing school zone that was only available during the summer school break, which also held high Liquidated Damages if not completed on time.
  • Despite being provided with a geotechnical report during the bidding phase, additional sandstone rock formations were discovered at various location requiring breakers to be utilized to create our ditch line.
  • Unforeseen existing utilities were unearthed that were not consistent with known records. Due to our experience, we were able to identify and protect the services and our people from any harm.